







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
ECO Window Systems Home Additions & ADU: The Sunrise Manor Owner’s Guide
We build home additions and detached or attached ADUs that are designed to align with ECO Window Systems window and door openings, and in Sunrise Manor the installed range runs $45,000 – $130,000 for a home addition and $90,000 – $220,000 for a full ADU. An addition or ADU is not a failed part you swap in an afternoon; it’s a structural and permitting project, so the work is scheduled and built, never same-day. What usually starts the call is a symptom: a new wing that’s too hot by 2 p.m., a converted garage that never got permitted, or a window line in the addition that doesn’t match the ECO Window Systems units already in the house.

We’re Bradford Remodeling Sunrise Manor, an independent contractor and not affiliated with ECO Window Systems. Our technicians have up to 22 years of experience, and every project carries a written price before any work starts plus The Garrison Standard behind it.
Key Takeaways
- Home additions in Sunrise Manor: $45,000 – $130,000 installed. ADUs: $90,000 – $220,000. Garage conversions: $30,000 – $80,000.
- The window and door schedule has to be set before framing, or your ECO Window Systems openings won’t line up.
- Permits get pulled and inspections passed. An unpermitted addition is a resale problem, not a shortcut.
- A written price comes before the first tool, and the 365-Day Done Right Promise covers the finished work for a full year.
Which ECO Window Systems Models This Applies To

ECO Window Systems builds window and door lines that show up across a lot of Sunrise Manor homes, and additions and ADUs have to match or deliberately upgrade what’s already there. Before we frame anything, we identify the existing units so the new openings and the new glazing schedule are consistent. There are two things to check on your existing units: the manufacturer label on the sash or frame (it lists the series and the glass package), and the actual rough opening dimensions, measured rather than assumed. Labels fade in Nevada sun, so if yours is unreadable we measure instead.
The OEM-versus-aftermarket decision is different for a build than for a repair. In a new addition, matching an older ECO Window Systems series exactly may cost more than specifying a current line with a comparable or better glass package, and the current line often performs better in our summer heat. What matters is that the window schedule is documented: series, size, glass rating, and finish, all in writing, so the framer, the glazier, and the inspector are working from the same sheet. We put that schedule in the written scope. If the rest of the house runs KraftMaid or Wellborn cabinetry, Cambria or Silestone surfaces, we can note the finish direction so the addition reads as part of the home rather than a bolt-on.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your ECO Window Systems Home Additions & ADU Is Failing
Additions and ADUs don’t fail like a hinge or a spring. They fail at the seams and in the details, and Sunrise Manor’s heat and sun exposure find every weak point.
- Hot rooms in the new space. A room that’s 8-10 degrees warmer than the rest of the house usually means the glass package in the addition wasn’t specified for our exposure, or the ECO Window Systems windows were set without the right low-e coating. This is a specification problem, not a cooling problem.
- Water staining at the addition roof line. Where the new roof meets the original, flashing is the failure point. Staining on the ceiling or wall of the new room often traces to a flashing detail that was rushed.
- Doors that stick or won’t latch. A new addition that swells and sticks with the seasons points to framing that wasn’t allowed to settle or a foundation that moved. In Sunrise Manor, expansive soils make slab prep matter.
- An unpermitted garage conversion on the record. If the work was done without permits, the buyer’s inspector will find it and the lender will care. This is the most common hidden problem we’re asked to correct.
- Window and door openings that don’t match the original house. When the addition’s ECO Window Systems units sit at a different sill height or use a different frame profile, the join looks like a patch rather than an extension.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
These are the installed ranges we work from in Sunrise Manor, with materials, labor, permits, and the written guarantee included. The number we quote is a written price before work begins, and it doesn’t move at the door.
| Project | Installed range |
|---|---|
| Home addition | $45,000 – $130,000 |
| ADU construction | $90,000 – $220,000 |
| Garage conversion | $30,000 – $80,000 |
| Impact window installation (addition glazing) | $8,000 – $25,000 |
| Window replacement (existing rooms) | $4,500 – $15,000 |
What drives the range: square footage, foundation and slab work, roof tie-in complexity, whether the ADU needs its own utility service, and the glass package you choose for the ECO Window Systems openings. We list line items so you can see where the money goes. The 365-Day Done Right Promise covers the completed work for a full year; if it doesn’t hold, we come back and correct it at no charge.

DIY or Call Us?
An addition or ADU is not a DIY project, and we won’t pretend otherwise. The honest split is this: you can safely check a few things on your own, and everything structural needs a licensed contractor and an inspector.
- Safe to check: the label on your existing ECO Window Systems units, whether the addition has a permit on record with the county, and where water stains appear after rain.
- Don’t take on yourself: framing, foundation, roofing tie-ins, electrical rough-in, and gas or plumbing connections. Getting any of those wrong risks injury, a failed inspection, and cost that runs well past the savings.
If you’re pricing an addition or ADU for your Sunrise Manor home, call (844) 834-2810 to schedule your free estimate. A live person answers at any hour, and the written price comes before any work starts.
FAQs

A well-built addition lasts as long as the original house, decades, provided the roof tie-in and foundation are done correctly for our soils and sun. The weak points are the seams and the weather sealing, which is where the 365-Day Done Right Promise earns its keep in the first year.
Sometimes. If the structure and permits are sound, we can correct a failing roof tie-in, reflash the junction, or re-glaze the ECO Window Systems openings without a rebuild. If the work was unpermitted or the foundation has moved, repair means bringing it up to code, and we’ll tell you which situation you’re in after the estimate.
A typical home addition in Sunrise Manor runs several months from permit to final inspection, and an ADU takes longer because of the separate utility service and the inspection schedule. We give you a written scope and a timeline before work starts, and we don’t quote a finish date we can’t hold.
We specify from a documented roster of brands with manufacturer specs and warranties, including ECO Window Systems-compatible glazing for the new openings, plus KraftMaid, Cambria, and Silestone for the interior finishes. Every spec is written into the scope so it’s traceable to a manufacturer’s warranty, not left to guesswork.
Call (844) 834-2810 to schedule your free estimate for your Sunrise Manor addition or ADU. You’ll get a written price, a documented scope, and a guarantee that holds for a full year.
Written by the team at Bradford Remodeling Sunrise Manor, serving Sunrise Manor and nearby areas.












